Davis Lock photo by: Ken Watson, 2002 |
Two canal staff wait by a tunnel sluice crab as the lock fills with water. Once the water level is raised to that of Opinicon Lake, they will turn the gate crab and open the upper gate, allowing the boats inside the lock to proceed out. |
Press your BACK button to return to the originating page or ... | Photo Gallery |